Entexia | Intelligent ecosystemThe heartbeat of your enterprise
🏗️ Construction

Construction project without Excel spreadsheet.

Gantt, materials, subcontractors, and site diary — all in one app for construction companies.

📊
74 %
of construction projects exceed budget without real-time cost control (McKinsey 2024)
📋
31 %
of project manager's time spent on reporting and finding information (Deloitte 2023)
⚠️
€28k
avg fine for incomplete site diary at inspection (GZS 2024)

Everything for a construction project

Plan, track, and bill — without separate tools.

Project Gantt chart

Visual display of phases and tasks on a timeline. Task dependencies, critical path, delays in red.

Material planning

Materials by project phase with ROI calculation. Purchase order directly from plan. Compare: planned vs used.

Subcontractors

Subcontractor database with ratings, documents, and contracts. Assignment to project with date and value.

Site diary

Daily entry: weather, workers, equipment, progress, safety incident. Field photos with geolocation.

Budget and cost control

Quote vs spent in real time. Alert when exceeding 80%. Estimate at completion (EAC).

Site hours tracking

Worker checks in via QR code at site entrance. Hours confirmed by foreman. Automatic to payroll.

Project GP-2025-047 — overview

Residential block Litija — value €820k

Project progress67 %
Earthworks100 %
Concrete structure100 %
External facade60 %
Installations40 %
Interior work0 %
Budget spent: €551k / €820kDeadline: 2026-03-31

Frequently asked questions

Does the module support eSTO site diary per ZGO-1?
Yes, eSTO compatible format is on the roadmap for Q3 2026. Currently the site diary is private — but allows PDF export for archiving or inspection submission.
How is the module adapted for structural construction vs. installation companies?
The module is generic — phases, tasks, materials, and subcontractors are configurable. Installers typically add phases: design, procurement, installation, commissioning, warranty. Each project has its own template.
Is it possible to track subcontractor warranty deadlines?
Yes. Each subcontractor has contract date, amount, and warranty period. 30 days before warranty expiry → reminder to project manager.
How does billing by construction valuations work?
Create a valuation from the plan (% of work by phases), add a recapitulation, and generate an invoice or proforma. Enterprise plan: e-invoice integration and VAT 9.5% (construction services).
Is the module suitable for a small construction company with 8 employees?
Yes. More complex systems require 3 months of onboarding. Entexia Construction is operational in 1 day — without special training.
How are safety incidents coordinated?
Worker or site manager records incident in diary (type, description, photo). Automatically goes to GDPR module (for health data) and alerts safety coordinator. Suitable for NIS2 and ZVZD-1 requirements.

Try the Construction module free.

7 days, no commitment. Register in 5 minutes.